+91 9040099999

Locality

| Upcoming Projects | M Soul Strings by Malpani Group Baner Pashan Pune 3 BHK and 4 BHK Price Location Floor Plan Review

Baner Pashan Link Road Upcoming view: 13604

M Soul Strings by Malpani Group Baner Pashan Pune 3 BHK and 4 BHK Price Location Floor Plan Review

M Soul Strings by Malpani Estates ( RERA No P52100055678 P52100076782) Baner Pashan Pune 3 BHK and 4 BHK

RERA No. Wing B No:– P52100076782, Wing C No:- P52100055678

Range ₹ 2.3 Cr to ₹ 4 Cr

Description

M–Soul Strings

M–Soul Strings by Malpani Estates is destined to be the new realty capital of the city. The project offers stupendously designed apartments with state-of-the-art amenities and facilities.

PROJECT DETAILS:-

Project Area - 5.20 Acres

No. of Towers - 4

Floors- B2+ B1+ LG+ Podium+ 27 floors

TYPE

Exclusive 3 & 4 BHK Homes

Spread across 5.2 Acres | 4 Towers | 50+ Premium Amenities

Structure : B2 + B1 + LG + Podium + 27 Floors

Carpet Area & Pricing:

3 BHK – Carpet 1302 Sqft - 2.30 Cr Onwards

4 BHK – Carpet 2060 Sqft - 3.50 Cr Onwards

Possession: As per RERA – Dec 29

Developer Commitment : Dec 27

Project Specification

RCC
• Earthquake-resistant structure & construction
with system form work
• Alu form Framework Is used
• Aluminum sheet grade- 6061T
Wall Thickness- 100 mm minimum
Plastering
• Internal: Gypsum plaster
• External: Texture on RCC
Painting
• Internal Flat: Acrylic Emulsion Paint
• External: Apex Paint
Door
• Main Door
Two Hrs. Fire Rated 45 mm Thick factory fabricated,
both side laminated flush door with frame & branded hardware
• Internal Doors
35 mm Thick factory fabricated, both side laminated flush door
with frame & branded hardware.
• Toilet Doors
35 mm Thick factory fabricated, both side laminated flush door
with frame & branded hardware.
• Attached Balcony Door
Aluminum powder coated Sliding Door with
toughened glass and mosquito net (Make - Schueco or equivalent)
Generator Backup
• Standby generator for light in common areas,
lifts & water pumps
Solar Water Heating System
• Solar water connection in Master Toilet
Rain Water Harvesting
• Rain water harvesting with recharge pits
Kitchen
• Platform: 'L' Shape engineered marble platform,
• 2 Nos of S.S. Sinks 1 with drain board and other
without drain board
• 2 feet Dado tiles above kitchen platform
• Provision for exhaust fan and aquaguard
• Washing machine water tap point in utility area
Fire Safety
• Fire fighting systems as per the statutory requirements
• Public address and fire evacuation system
• Fire System in the Flat; Sprinkler will be in every room
and it will be on wall (Make-New Edge)
Window
• Aluminum powder-coated windows with toughened glass
and mosquito net (Make - Schueco or equivalent)
Flooring & Tiling
• Vitrified tiles for flat flooring of size 800 mm X 1200 mm
• Vitrified tiles for Balcony flooring of size 800 mm X 1200 mm
• Vitrified tiles for Toilet Dado & Flooring of size
800 mm X 1200 mm
Toilets
• Wall Hung WC in all toilets (Make - TOTO or Equivalent)
• Over-counter Wash basins in all toilets
(Make - TOTO or Equivalent)
• C.P. fittings (Make - Grohe)
• Exhaust Fan & Provision for geyser
• False ceiling in all toilets
• Glass partition in common Toilet & Children's toilet
• Glass partition with openable door in master toilet
• Flush system - Pioneer Double flush system
(2 & 4 litres separate tanks provide by Gebrit)
Security System
• Round the clock security for the project with
professional security agencies
• CCTV System at Ground floor Entrance/Lobbies
of all Buildings and project’s main entry gate
• Main Gate with Boom Barrier System
• Digital Lock with Video Door Phone & intercom in each flat
Lifts
• Branded lifts:
Three Passenger lifts for 8 persons
One service - stretcher lift
• Elegant lift lobbies
Electrical
• Branded electrical wires & Cables (Polycab or equivalent)
• Electrical switches one miniature circuit breaker
(MCB) (Make - Legrand or Equivalent)
• LED energy efficient lights for common area
• TV point in living & all bedrooms
• Earthing & Lightening arrester
• Electrical Power Riser system with Busbar
Sewage Treatment Plant & OWC
• Sewage treatment plant as per the statutory requirements
• Organic waste composter as per the statutory requirements
Plumbing
• Drainage - Vertical Single Stack System
(Make - Geberit or Equivalent)
• Water Supply - Composite piping system
(Make - Mepla or Equivalent)

Amenities

M A S T E R L A Y O U T
1. Entry Branding
2. Entry/Exit
3. Bus Pick Up/Drop Off Point
4. Portal
5. Entry Court
6. Water Feature
7. Selfie Point
8. Chit-chat Corner
9. Drop Off
10. Reflexology Pathway
11. All Season Flower Garden
12. Swing Park
13. Pets Park
14. Net-cricket
15. Leisure Lawn
16. Flag Hoisting
17. Grand Multipurpose Lawn
18. Amphitheatre
19. Senior Citizen Corner
20. Social Island
21. Temple
22. Jogging Trail
23. Basketball Court
24. Play Park
25. Mound Room
26. Toddler Play Area
27. Sandpit
28. Forest Trail
29. Natures Corner
30. Orchard
31. Aromatic Garden
32. Pool Side Cabanas
33. Swimming Pool
34. Kids Pool
35. Outdoor Shower

Additional Details

Construction:Under Construction

No of Floors:B2+ B1+ LG+ Podium+ 27 floors

Parking:2 Basement + Ground

Possession:As per RERA 31/12/2031

Total Bldgs./Towers:4

Distance from Project

Airport: 20 Km.

School: 2 Km.

Hospital: 2 Km.

Market: 1 Km.

Railway Station: 14 Km.

Address

Address: Malpani Soul Strings Baner Pashan

City: Pune

State/Country: Maharashtra

Pincode: 411045

Country: India

Project Layout

Video

No Video Available

Enquire and schedule site visit

Fill this form to schedule and appointment